James R. Herman Cruise Terminal at Pier 27
Pier 27, on the waterfront of the famous city, was redeveloped to headquarter the 2013 America’s Cup held on San Francisco Bay. The contemporary update featured an attractive façade with structural glazing on built up profile steelwork. Novum’s CCG-System features custom stainless steel corner clamps that are small but elegantly highlight the glass geometry. The glazing system is combined with custom profiles made of bolting plates together. Integrated door and stainless panel entries were included into the single source package.
Location: San Francisco, California, USA
Size: 4,500 sq ft / 420 sq m
Systems Used: BB, CCG
Architect: KMD Architects & Pfau Long Architecture